ci(windows): run the engine and CLI tests in three shards, not two, to stay under the step deadline (#8476)

This commit is contained in:
Miguel Ángel
2026-11-22 09:32:57 +00:00
committed by GitHub
parent f51e57b26e
commit a638c31aa1
+8 -4
View File
@@ -433,18 +433,22 @@ jobs:
studio_shard: 2/2
- lane: core
packages: --filter @hyperframes/core --filter @hyperframes/player --filter @hyperframes/shader-transitions
# Engine and CLI ran one after the other in a single lane (about 5 + 11 min), 16 min of a 16 min deadline;
# each half runs the same two packages with Vitest's --shard, so the lanes end together.
# Engine and CLI run the same two packages in thirds with Vitest's --shard: halves sat at 842-934 s of
# the 960 s step deadline, so a slow runner failed them.
- lane: engine-cli-1
packages: --filter @hyperframes/engine --filter @hyperframes/cli
test_shard: 1/2
test_shard: 1/3
process_tests: true
- lane: engine-cli-2
packages: --filter @hyperframes/engine --filter @hyperframes/cli
test_shard: 2/2
test_shard: 2/3
process_tests: true
once_checks: true
runtime_contract: true
- lane: engine-cli-3
packages: --filter @hyperframes/engine --filter @hyperframes/cli
test_shard: 3/3
process_tests: true
steps:
- name: Disable Windows Defender real-time monitoring